Services
SOIL FILLING
Earth should be free from stumps, roots, grass, clods, and large pieces of stones because these objects hinder proper compaction of soil manually or mechanically. Care should be taken that the earth is free from 'Kallar' and alkaline materials. Earthen works should be laid in 20 cm. layers.
SOIL REMOVED
In many instances, based on site assessment data and site constraints, the most cost-effective and expedient method of a site cleanup and closure is source removal of the contaminated media. Our team is experienced in the execution of source removal projects and state and local permitting prerequisite requirements.
HOLES FOR RETAINING WALL
Weep Holes are provided in earth retaining structures like retaining walls, underpasses, wing walls and other below ground drainage structures. From engineering point of view. Weep Hole is provided in these structures to relieve hydrostatic pressure or water pressure on the walls. Reducing the water pressure on the walls will reduce the structural design demand of the water or earth resisting wall by reducing its thickness as well as reinforcement requirements.